Skip to main content

Labamu

Labamu Manufacturing

Bill of Materials

Arrange the product structure once, then use it repeatedly as a basis for material calculations, work sequence, and cost estimates for each production.

One Reference for Each Product

Materials, work stages and cost estimates are arranged in one place which is a common reference.

Automatic Material Calculation.

Automatic Material Calculation. Material requirements are calculated according to the amount of production carried out.

Estimated Costs from the Start.

Estimated production costs are read before work begins.

Connect to Work Order.

Each Work Order runs according to predetermined references.

From Product Reference to Production Implementation

key benefits

Production Planning Starting from the Same Data

The Bill of Materials is the starting point for planning, so that material requirements and work stages are read consistently throughout the process.

Each product has a list of materials along with the quantities needed, stored neatly and ready to be used repeatedly.

Clear Material Arrangement

The order of work is structured according to how the business works, from start to finished product.

Work Stages According to Process

Estimated costs are composed of materials and stages that have been determined.

Calculated Cost Estimates

Connect with Other Features

Material Management

Material requirements from the Bill of Materials are checked against stock availability.

Work Order Management

Work Orders follow the work stages that have been determined.

Product Catalog

The products in the catalog are the basis for preparing the Bill of Materials.

Labamu Manufacturing

See all Labamu Manufacturing capabilities and how each feature connects.

Start Developing Consistent Production References

Schedule a demo with our team to see how Labamu Manufacturing works in the production business flow.