Labamu
Indonesia
Singapore
Arrange the product structure once, then use it repeatedly as a basis for material calculations, work sequence, and cost estimates for each production.
Materials, work stages and cost estimates are arranged in one place which is a common reference.
Automatic Material Calculation. Material requirements are calculated according to the amount of production carried out.
Estimated production costs are read before work begins.
Each Work Order runs according to predetermined references.
The Bill of Materials is the starting point for planning, so that material requirements and work stages are read consistently throughout the process.
Each product has a list of materials along with the quantities needed, stored neatly and ready to be used repeatedly.
The order of work is structured according to how the business works, from start to finished product.
Estimated costs are composed of materials and stages that have been determined.
Material requirements from the Bill of Materials are checked against stock availability.
Work Orders follow the work stages that have been determined.
The products in the catalog are the basis for preparing the Bill of Materials.
See all Labamu Manufacturing capabilities and how each feature connects.
Schedule a demo with our team to see how Labamu Manufacturing works in the production business flow.