{"id":17551,"date":"2026-04-24T13:21:36","date_gmt":"2026-04-24T06:21:36","guid":{"rendered":"https:\/\/labamu.co.id\/uncategorized-en\/labamu-manufacturing-update-more-flexible-production-without-changing-your-workflow\/"},"modified":"2026-04-30T14:23:43","modified_gmt":"2026-04-30T07:23:43","slug":"labamu-manufacturing-update-more-flexible-production-without-changing-your-workflow","status":"publish","type":"post","link":"https:\/\/labamu.co.id\/en\/article\/labamu-manufacturing-update-more-flexible-production-without-changing-your-workflow\/","title":{"rendered":"Labamu Manufacturing Update: More Flexible Production Without Changing Your Workflow"},"content":{"rendered":"\n<p>Labamu provides updates to its manufacturing ERP system to increase Work Order flexibility and production visibility, without changing existing workflows.<\/p>\n\n<h2 class=\"wp-block-heading\">Update Summary<\/h2>\n\n<p>With this update, you can:<\/p>\n\n<ul class=\"wp-block-list\">\n<li>Execute Work Orders without having to wait for all materials to be available<\/li>\n\n\n\n<li>Set the system according to operational needs (flexible or strict)<\/li>\n\n\n\n<li>Manage materials with more accurate and realistic flows<\/li>\n\n\n\n<li>Monitor production progress and bottlenecks in real-time via a visual dashboard<\/li>\n<\/ul>\n\n<h2 class=\"wp-block-heading\">Update Details<\/h2>\n\n<h3 class=\"wp-block-heading\">More Flexible Work Orders<\/h3>\n\n<p>Work Orders can now be executed even if materials are not yet fully available. The production team can start work earlier, while material requirements can be submitted according to conditions in the field.<br\/>This helps reduce waiting times and keep operations running. <\/p>\n\n<h3 class=\"wp-block-heading\">Material Allocation Arrangements According to Needs<\/h3>\n\n<p>Labamu provides customizable setting options:<\/p>\n\n<ul class=\"wp-block-list\">\n<li>Flexible modes for dynamic production<\/li>\n\n\n\n<li>Strict mode to ensure all materials are available before production starts<\/li>\n<\/ul>\n\n<p>With this setting, the system can follow business needs without changing existing workflows.<\/p>\n\n<h3 class=\"wp-block-heading\">More Accurate Material and Inventory Flow<\/h3>\n\n<p>Changes were also made to the way materials are managed:<\/p>\n\n<ul class=\"wp-block-list\">\n<li>Materials do not immediately reduce stock when a Work Order is created<\/li>\n\n\n\n<li>Stock will be deducted when the material is actually received and used<\/li>\n<\/ul>\n\n<p>As a result, inventory data becomes more accurate and production cost calculations are more precise.<\/p>\n\n<h3 class=\"wp-block-heading\">Production Monitoring with Clearer Visuals<\/h3>\n\n<p>Labamu now presents a production monitoring dashboard to help you understand operational conditions in real-time.<\/p>\n\n<h4 class=\"wp-block-heading\">Burndown Chart<\/h4>\n\n<figure class=\"wp-block-image size-large\"><img fetchpriority=\"high\" decoding=\"async\" width=\"1024\" height=\"559\" src=\"https:\/\/labamu.co.id\/wp-content\/uploads\/2026\/04\/Gemini_Generated_Image_ipszmuipszmuipsz-1024x559.jpg\" alt=\"\" class=\"wp-image-17391\" srcset=\"https:\/\/labamu.co.id\/wp-content\/uploads\/2026\/04\/Gemini_Generated_Image_ipszmuipszmuipsz-1024x559.jpg 1024w, https:\/\/labamu.co.id\/wp-content\/uploads\/2026\/04\/Gemini_Generated_Image_ipszmuipszmuipsz-300x164.jpg 300w, https:\/\/labamu.co.id\/wp-content\/uploads\/2026\/04\/Gemini_Generated_Image_ipszmuipszmuipsz-768x419.jpg 768w, https:\/\/labamu.co.id\/wp-content\/uploads\/2026\/04\/Gemini_Generated_Image_ipszmuipszmuipsz-1536x838.jpg 1536w, https:\/\/labamu.co.id\/wp-content\/uploads\/2026\/04\/Gemini_Generated_Image_ipszmuipszmuipsz-2048x1117.jpg 2048w\" sizes=\"(max-width: 1024px) 100vw, 1024px\" \/><\/figure>\n\n<p>Used to monitor:<\/p>\n\n<ul class=\"wp-block-list\">\n<li>Remaining work against time<\/li>\n\n\n\n<li>Production progress compared to target<\/li>\n<\/ul>\n\n<h4 class=\"wp-block-heading\">Cumulative Flow Diagram<\/h4>\n\n<figure class=\"wp-block-image size-large\"><img decoding=\"async\" width=\"1024\" height=\"559\" src=\"https:\/\/labamu.co.id\/wp-content\/uploads\/2026\/04\/Gemini_Generated_Image_wqot1iwqot1iwqot-1024x559.jpg\" alt=\"\" class=\"wp-image-17392\" srcset=\"https:\/\/labamu.co.id\/wp-content\/uploads\/2026\/04\/Gemini_Generated_Image_wqot1iwqot1iwqot-1024x559.jpg 1024w, https:\/\/labamu.co.id\/wp-content\/uploads\/2026\/04\/Gemini_Generated_Image_wqot1iwqot1iwqot-300x164.jpg 300w, https:\/\/labamu.co.id\/wp-content\/uploads\/2026\/04\/Gemini_Generated_Image_wqot1iwqot1iwqot-768x419.jpg 768w, https:\/\/labamu.co.id\/wp-content\/uploads\/2026\/04\/Gemini_Generated_Image_wqot1iwqot1iwqot-1536x838.jpg 1536w, https:\/\/labamu.co.id\/wp-content\/uploads\/2026\/04\/Gemini_Generated_Image_wqot1iwqot1iwqot-2048x1117.jpg 2048w\" sizes=\"(max-width: 1024px) 100vw, 1024px\" \/><\/figure>\n\n<p>Used for:<\/p>\n\n<ul class=\"wp-block-list\">\n<li>See the distribution of work at each stage<\/li>\n\n\n\n<li>Identifying bottlenecks and work backlogs (WIP)<\/li>\n<\/ul>\n\n<h2 class=\"wp-block-heading\">Faster Production, Maintained Control<\/h2>\n\n<p>With this update, Labamu helps your business run production faster, maintain data accuracy, and improve operational visibility. All without disturbing the work system that was already running previously. <\/p>\n\n<h2 class=\"wp-block-heading\">Manage Production More Efficiently with Labamu Manufacturing<\/h2>\n\n<p>Discover how Labamu helps you manage Work Orders, materials and production in one integrated system.<\/p>\n\n<p><a href=\"https:\/\/mrp.labamu.co.id\/login\/\" title=\"\">Visit the Labamu Manufacturing page<\/a><\/p>\n","protected":false},"excerpt":{"rendered":"<p>Labamu provides updates to its manufacturing ERP system to increase Work Order flexibility and production visibility, without changing existing workflows. Update Summary With this update, you can: Update Details More Flexible Work Orders Work Orders can now be executed even if materials are not yet fully available. The production team can start work earlier, while [&hellip;]<\/p>\n","protected":false},"author":10,"featured_media":17550,"comment_status":"closed","ping_status":"closed","sticky":false,"template":"","format":"standard","meta":{"_acf_changed":false,"content-type":"","om_disable_all_campaigns":false,"download_link":"","footnotes":""},"categories":[219,268],"tags":[],"class_list":["post-17551","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-article","category-manufacturing"],"acf":[],"aioseo_notices":[],"meta_description":"Labamu Manufacturing's latest update enables more flexible Work Orders, more accurate material flow, and real-time production monitoring in one manufacturing ERP system.","views":0,"_links":{"self":[{"href":"https:\/\/labamu.co.id\/en\/wp-json\/wp\/v2\/posts\/17551","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/labamu.co.id\/en\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/labamu.co.id\/en\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/labamu.co.id\/en\/wp-json\/wp\/v2\/users\/10"}],"replies":[{"embeddable":true,"href":"https:\/\/labamu.co.id\/en\/wp-json\/wp\/v2\/comments?post=17551"}],"version-history":[{"count":1,"href":"https:\/\/labamu.co.id\/en\/wp-json\/wp\/v2\/posts\/17551\/revisions"}],"predecessor-version":[{"id":17554,"href":"https:\/\/labamu.co.id\/en\/wp-json\/wp\/v2\/posts\/17551\/revisions\/17554"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/labamu.co.id\/en\/wp-json\/wp\/v2\/media\/17550"}],"wp:attachment":[{"href":"https:\/\/labamu.co.id\/en\/wp-json\/wp\/v2\/media?parent=17551"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/labamu.co.id\/en\/wp-json\/wp\/v2\/categories?post=17551"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/labamu.co.id\/en\/wp-json\/wp\/v2\/tags?post=17551"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}